Northern Colorado water infrastructure: A conversation about The Vita H2O Project
Water resilience is not about replacing one source with another. It’s about building a more flexible, reliable portfolio that can support communities through changing conditions.
In a recent conversation with ISCO Industries, FrontRange H2O President Brent Waller shared how The Vita H2O Project™ is being designed to work alongside existing surface water supplies as a drought and firming tool for northern Colorado.
ISCO Industries is a leading provider of HDPE piping products, fusion equipment and technical services for water and infrastructure projects. As a key supply partner for The Vita H2O Project, the ISCO team brings specialized expertise to the project’s long-term pipeline design.
Together, Brent and the ISCO team discuss the infrastructure decisions behind the project, the value of a bidirectional pipeline system and why HDPE is well suited for a project built with long-term flexibility in mind.
Below are a few key takeaways from the conversation.
The project is designed to complement existing water supplies
The Vita H2O Project is designed around conjunctive use, integrating surface water and non-tributary groundwater to create a more resilient supply portfolio rather than just relying on a single source.
Surface water can continue to serve as a primary supply when conditions allow. During drought periods, supply uncertainty or other high-demand periods, groundwater from The Vita H2O Project can help water providers add flexibility to their systems.
The project is built around non-tributary groundwater
The Vita H2O Project will source water from the Upper Laramie Aquifer (ULA), a deep non-tributary groundwater source in northern Colorado.
Because non-tributary groundwater is not connected to surface streams or rivers in the same way as tributary groundwater, it can provide a more consistent, independent supply to complement regional surface water resources.
Aquifer storage and recovery creates future flexibility
Aquifer storage and recovery, often called ASR, is a central part of the project’s long-term approach.
The project’s future bidirectional pipeline design is intended to allow water to move in both directions. During periods of surplus, treated water may be returned to the aquifer for underground storage. During drier conditions, that water can be recovered and used when it is needed most.
This approach is designed to support long-term water management while reducing the evaporation losses associated with surface storage.
HDPE supports the project’s long-term infrastructure needs
HDPE, or high-density polyethylene pipe, was selected for the project’s pipeline infrastructure. For a 27-mile underground pipeline designed to support a long-term water system, material selection matters. HDPE was selected for its flexibility, constructability and durability, along with its heat-fused joints that create a continuous pipeline system.
Those characteristics are especially important for infrastructure designed to operate reliably over a long planning horizon.
Watch the full conversation
Watch FrontRange H2O President Brent Waller’s full conversation with ISCO Industries to learn more about the infrastructure, planning and long-term thinking behind The Vita H2O Project.
